Search 800 + Posts
Jan 13, 2012
Scheduling Group in OM
When a new line is inserted into a scheduling group (such as a ship set or a configuration), system will first try to schedule the new line with the same attributes as the other lines in the scheduling group. If that fails, then it checks the value of the profile option Auto Push Group Date. If the value is No, the line is inserted but not scheduled. If the value is Yes, the system tries to reschedule the whole set. If rescheduling the whole set fails, the line is inserted but not scheduled.